Site Classification Reports QLD | AS 2870 | Coastal Geo Consulting

A site classification tells your designer what the ground beneath the building is going to do. We investigate the site, test the soil to Australian Standard methods and issue an AS 2870 report your engineer can design a compliant slab and footing system from — without guesswork and without delays to your build programme.

What's in your site classification report

Every report we issue is built from field investigation and laboratory testing to Australian Standard methods — so your designer has measured data, not assumptions.

When a site classification is required

A site classification is required before footing and slab design on virtually every residential build in Queensland, and it is typically a condition of building approval.

If your site has cut and fill, established trees, uncontrolled fill or reactive clay, the classification is where those risks get identified — before they turn into a variation.

Understanding your site class

Class What it means Surface movement
ASand or rock. Little or no movement from moisture changeNegligible
SSlightly reactive clay0 – 20 mm
MModerately reactive clay or silt20 – 40 mm
H1Highly reactive clay40 – 60 mm
H2Highly reactive clay, greater movement potential60 – 75 mm
EExtremely reactiveMore than 75 mm
PProblem site — needs project-specific engineeringClassified by condition

A more reactive class does not mean a difficult build. It means the footing system needs to suit the ground. The cost risk comes from finding out late, not from the classification itself.

Read our full guide to site classification reports in Queensland →

Testing to Australian Standard methods

Reactivity cannot be judged by eye. Where a reactive profile is present, we test to the AS 1289 series:

Results are combined with the design depth of suction change for your climatic zone to calculate characteristic surface movement under AS 2870 Appendix D. That number determines your site class — and it is stated in the report, not hidden behind it.

Field-based, not desktop-based

Where we work

South-East Queensland, Regional Queensland and Northern NSW. Based in Wamuran, servicing Brisbane, Moreton Bay, Sunshine Coast, Gold Coast, Ipswich, Toowoomba and surrounds.

Common questions

We typically mobilise to site within 3 business days of your booking, with the report issued within 2 business days of fieldwork being completed. Where laboratory shrink-swell testing is required, allow additional time for the testing turnaround. If your programme is tight, tell us early and we will work to it.

Cost depends on lot size, access, the number of test locations required and whether laboratory reactivity testing is needed. Send through the site address and any plans you have and we will come back with a fixed quote.

Site address, lot and plan details, and a site or architectural plan if you have one. Proposed levels and any known fill or demolition history help us scope the investigation accurately.

For a standard house on a conventional lot, an AS 2870 classification is usually the right scope. Retaining walls, steep sites, deep cuts, commercial buildings and civil works generally need a broader investigation to AS 1726. If you are unsure, send us the plans and we will tell you which you need.

Yes. Mature trees draw moisture from reactive soil, and removing them lets the soil re-wet and heave, sometimes over many years. Tree location, species and whether they are being retained or removed can change the classification and the footing advice.

Get a quote for your site

Send through the address and plans and we will come back with a scope and fixed price.