Testing runs through NATA accredited laboratories. We scope the testing your specification requires, choose where and when to test, manage the sampling and the logistics, and read the results against the specification and the design.
We work with two NATA accredited laboratories and choose between them by where the project is. We collect the samples, prepare the chain of custody and test request, deliver them to the laboratory and receive the reports by email.
You get one point of contact, one report and one invoice.
Under AS 2870, sites containing fill are classified as Class P. Where the fill has been placed as controlled fill, in accordance with the relevant requirements of AS 2870 and AS 3798, footings can generally be founded within the controlled fill, subject to the requirements of the structural and geotechnical design.
Controlled fill is placed in nominated layers, compacted to the specified density and progressively tested to verify that the required compaction has been achieved.
Where fill is uncontrolled, it cannot be relied upon as a suitable founding material for conventional footings. In these circumstances, footings generally need to extend through the uncontrolled fill and be founded into suitable natural ground, or an alternative foundation solution may be required.
If you are placing fill on a residential lot, arrange testing progressively as the fill is placed. This provides the necessary evidence to establish whether the fill has been constructed as controlled fill and can subsequently be relied upon for footing design.
Site classification, AS 2870
Common questions
It depends on the volume of fill, how many layers need testing, the site location and the turnaround. Send the earthworks specification and the extent of fill and we will come back with a fixed price.
Sizing pavement layers. The CBR value describes how much load the subgrade can carry, and the pavement designer uses it to work out how thick the base and sub-base need to be.
Yes. Where a residential site involves new fill, we can coordinate both services as part of the same project. Compaction testing is undertaken progressively as the fill is placed to verify that it has been constructed in accordance with the required specifications. Once the earthworks are complete, the site classification can then be undertaken using the available earthworks and testing records to assess the completed site in accordance with AS 2870.
The specification usually sets it, by volume or by layer. Where it does not, we scope it against AS 3798 and the conditions on the job.
Field density results come back faster than laboratory CBR and moisture density work. Tell us the programme when you book and we will schedule the sampling around it.
Send the site address, the lot and plan, and any drawings you have.